Managing Partner; AL Contact Services Snc

Telephone: +39 (06) 978 48 576
Mobile: +39 340 402 8715
Email: d.appuhn@alcservices.com or dick@appuhn.us
Address: Corso Vittorio Emanuele II, 154; 00186 Rome Italy
Overview
Richard is active in the field of dispute resolution in the international heavy construction industry. He is an active dispute board adjudicator and arbitrator. His activities also involve providing consulting services advising Employers, Engineers and Construction Companies.
His fields of expertise include energy, transportation and marine works with specific familiarity in Dams, Tunnelling, Underground Openings, Highways, Railways, Buildings, Water Supply and Treatment, Marine Engineering, and Dredging.
He also acts as expert in matters of design and construction.
Country Experience
USA, Mexico, Panama, Columbia, Argentina, Italy, Germany, Belgium, Romania, Albania, Greece, Montenegro, Serbia, Jordan, Saudi Arabia, Iran, Iraq, Qatar, UAE, Hong Kong, China, Thailand, Laos, Vietnam.
Languages Spoken – English, Italian
Academic Qualifications
- BS Civil Engineering, University of California, Berkeley
- MS Civil Engineering, University of California, Berkeley.
Professional Qualifications
- Registered Civil Engineer California USA
- Registered Geologist California USA
- Registered Engineering Geologist California USA
- Certified Adjudicator, FIDIC President’s List
Professional Memberships and Affiliations
- Affiliate Member, International Federation of Consulting Engineers.
- Life Member, American Society of Civil Engineers.
- Professional Member and Past President, Dispute Resolution Board Foundation.
- Member of Association for Advancement of Cost Engineering International.
- Member of the Society for Construction Law.
Lecturing and Teaching
Lecturer in Masters Programme in Contract Claim and Delay Management in Construction Works; Milan Polytechnic Institute, Milan, Italy.
Project Experience
- Civil Engineering – Airports
- Civil Engineering – Dams & Reservoirs
- Civil Engineering – Foundations & Subsidence or Settlement
- Civil Engineering – Irrigation & Land Reclamation
- Civil Engineering – Land Drainage & Dewatering
- Civil Engineering – Metro Surface & Underground
- Civil Engineering – Motorways & Rail
- Civil Engineering – Port Construction & Dredging
- Civil Engineering – Retaining Walls
- Civil Engineering – River & Flood Control
- Civil Engineering – Site Investigation
- Civil Engineering – Tunnelling & Piling
- Construction – Industrial
- Construction – Mixed Use
- Energy – Dams & Hydro
- Energy – Thermal
- Transport – Roads, Bridge Roads & Bridges
- Water – Sewerage Treatment
- Water – Water Supply & Environmental
Experience in Dispute Boards and Arbitrations
- Expert Witness on Ground Conditions, Contract and Delay; CRCICA Arbitration 1665/2023; Egypt.
- Member of Arbitration Tribunal ICC Case 28024; Contract for Civil Works on the Construction of Mtkvari Hydropower Project, Georgia; 2023.
- Sole Member Dispute Adjudication Board, Labour Compound Al Wakra, Qatar. Agreement No: U0831LAAW-SCA-00154; FIDIC Conditions of Subcontract for Construction, First Edition 2011.
- Sole Member Dispute Adjudication Board, Labour Compound Al Wakra, Qatar. Agreement No: U0831LAAW-SCA-00154; FIDIC Conditions of Subcontract for Construction, First Edition 2011.
- Sole Member Dispute Adjudication Board, Integrated Families Housing, Qatar. Agreement No: U08301FHW-SCA-00109; FIDIC Conditions of Subcontract for Construction, First Edition 2011.
- Sole Member Dispute Adjudication Board; Labour Compound Al Wakra, Qatar. Agreement No: U0831LAAW-SCA-00088; FIDIC Conditions of Subcontract for Construction, First Edition 2011.
- Chair, Dispute Adjudication Board, Renovations and Upgrading of Crown Plaza Complex, Dubai UAE, FIDIC Conditions of Subcontract for Construction, First Edition 2011.
- Member Dispute Avoidance and Adjudication Board, Construction of Modjo Dry Port Upgrading and Expansion of Hub Facilities, Djibouti. FIDIC .Conditions of Contract for Plant and Design-Build, Second Edition 2017.
- Sole Member Dispute Board for Design and Construction of the Wastewater Treatment Plant (WWTP) of the City of Pljevlja, FIDIC Conditions of Contract for Plant and Design-Build, First Edition 1999.
- Member of Arbitration Panel; PCA Case 2021-04; Rehabilitation of M3 Chisinau – Giurgiulesti Road; km 151+200-171+290 and km 179+650 – 190+750; Moldova.
- Sole Member Dispute Board for Rehabilitation of Wastewater Treatment Plant and New Sludge Treatment Facilities; Chisinau Water Development Programme, Moldova; FIDIC Conditions of Contract for Plant and Design-Build, First Edition 1999.
- Sole Member Dispute Board for the Reconstruction and Improvement of the M 1 Motorway, Talin to Gyumri Road from km 71 +500 to km 90+200 (Talin-Lanjik Section) – Contract T3-CW-01, Armenia; MDB Harmonized Edition 2010.
- Sole Member Dispute Board for the Reconstruction and Improvement of the M 1 Motorway, Talin to Gyumri Road from km 90+200 to km 117+670 (Lanjik-Gyumri Section); ContractT3-CW-02, Armenia; MDB Harmonized Edition 2010.
- Member Dispute Adjudication Board for the Construction of Qukës-Qafë Pllocë Road Project Section of the Tirana-Korça Road Corridor Section 2 in Albania, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Member Dispute Adjudication Board for the Construction of Qukës-Qafë Pllocë Road Project Section of the Tirana-Korça Road Corridor Section 1 in Albania, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Sole Member Dispute Adjudication Board for the Lusaka Water Supply Project, Millenium Challenge Account Zambia, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Arbitrator, for Vichitbhan Construction Company Ltd (Thailand) v Cooperativa Muratori and Cementisti – CMC di Ravenna (Italy), ICC International Court of Arbitration No. 21215.
- Presiding Member Dispute Adjudication Board for the Combined Cycle HP Plant; Lichterfelde district of Berlin.; FIDIC Conditions of Contract for Plant and Design-Build, First Edition 1999.
- Presiding Member Dispute Adjudication Board for the Sarajevo Bypass, Bosnia and Herzegovina; FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Sole Member Dispute Adjudication Board for Roads Rehabilitation V Project on DN66 (E79), Rovinari – Bumbesti Jiu km 48+900 – 93+500; FIDIC Conditions of Contract for Plant and De-sign-Build Works, First Edition 1999.
- Sole Member Dispute Adjudication Board for Lugoj – Deva Motorway, Lot 3 km 56-220 – km 77+361, Romania; FIDIC Conditions of Contract for Plant and Design-Build Works, First Edition 1999.
- Presiding Member Dispute Adjudication Board for Sana’s Wastewater Treatment Plant Upgrade Project, Oman, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Sole Member Dispute Adjudication Board for Upgrading of Ishaka· Kagamba Road, Uganda. FIDIC Conditions of Contract for Construction and Engineering Works, MDB Harmonized Edition, 2010.
- Sole Member Dispute Adjudication Board for Construction of Lugoj By Pass, Romania. FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Court Appointed Expert; Jeddah Administrative Court; Kingdom of Saudi Arabia, 2018-2019.
- Arbitrator, for Vichitbhan Construction Company Ltd (Thailand) v Cooperativa Muratori and Cementisti – CMC di Ravenna (Italy), ICC International Court of Arbitration 19155– Asia Office.
- Presiding Member Dispute Adjudication Board for the Rehabilitation of Arusha- Minjingu Road (98 km), Tanzania, FIDIC Conditions of Contract for Construction and Engineering Works, MDB Harmonized Edition, 2010.
- Sole Member Dispute Adjudication Board for Wastewater & Sludge Treatment Plant Refurbishment in Oradea City, Romania. FIDIC Conditions of Contract for Plant and Design-Build Works, First Edition 1999.
- Member, Dispute Board for the Upgrading of Songea – Namtumbo Road (67km) to Bitumen Standard, Tanzania, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Presiding Arbitrator, for The Hellenic Republic Ministry of Infrastructure, Transport and Net-works v Aegean Motorway S.A., ad hoc.
- Arbitrator, for JV Aegek-Tahal (Greece Romania) vs. Ministry of Public Finance-Central Finance and Contracts Unit (Romania), ICC International Court of Arbitration.
- Sole Member Dispute Adjudication Board for the Aposto-Wondo-Negele Road Upgrading Project, Ethiopia; FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Member, Dispute Board for the Vietnamese Television Center Project Civil Works, Vietnam.
- FIDIC 4th Edition 1987 (1992 Reprint) with 1996 Supplement for Dispute Resolution.
- Sole-Member Board, for the Rehabilitation of the Beira, Quelimane and Tete Airports, Mozambique. FIDIC Conditions of Contract for Plant and Design-Build Works, First Edition 1999.
- Chairman, Dispute Adjudication Board for the Residential Complex “The Oaks”, Romania FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Sole Member Board, for Rehabilitation of the Agapia Monastery Tourist Area Project, Romania, FIDIC Conditions of Contract for Construction and Engineering Works, First Edition 1999.
- Member, Dispute Board for Integrated Growth Poles Project, Port of Ehoala, Madagascar. FIDIC Conditions of Contract, MDB Harmonized Edition, 2005.
- Member, Dispute Review Board, Pitesti Bypass Project, Romania. FIDIC Conditions of Contract, FIDIC 4th Edition 1987 with 1996 Supplement for Dispute Resolution.
- Consultant in Dispute Adjudication Procedures for Ghazi Barotha Irrigation Project, Pakistan.
- Consultant in arbitration under ICC Rules for Trans European Motorway Project, Bulgaria.
- Consultant in arbitration under ICC Rules for Dire Dam Project, Ethiopia under FIDIC 4th Edition.
- Consultant in arbitration under ICC Rules for Chida Sodo Feeder Road Contract, Lot 2, Ethiopia under FIDIC 4th Edition.
- Consultant in arbitration under ICSID Rules for Karameh Dam Project, Jordan under FIDIC 4th Edition.
- Consultant in arbitration under ICSID Rules for Rabat-Fez Highway Project, Morocco under National CPAC Conditions.
- Consultant in arbitration under ICC Rules for Garifiri Hyroelectric Project, Guinea under FIDIC 4th Edition.
- Consultant in arbitration under ICC Rules for the Matsapha International Airport Project, Swaziland under South African Standard Conditions of Contract for Civil Engineering Works.
- Consultant and expert witness in litigation for the Blue River Dam Project, Eugene Ore under Standard Conditions of Contract US Corps of Engineers. United States Court of Claims 1970.
Selected Projects
- Rail Baltica “International Airport “Riga”; Railway Stations, related Infrastructure and Estacade Construction Work; Latvia – Appointed by Employer to a retainer consultancy agreement to provide advice as required concerning the Contract and its DAAB procedures under a bespoke design-build agreement based on the 2017 FIDIC Suite of Construction Contracts.
- Kyosha Dam Hydroelectric Project, Ethiopia – Appointed to draft Conditions of Contract for the EPC-Turnkey construction of a 2,200 MW hydroelectric scheme consisting of a roller compacted concrete dam, with surface powerhouse and gated spillway. Project value approximately €2,550 million is presently under negotiation.
- Great Ethiopian Renaissance Dam Hydroelectric Project, Ethiopia – Appointed to draft Conditions of Contract for the EPC-Turnkey construction of a 5,200 MW hydroelectric scheme consisting of a roller compacted concrete dam, earth fill saddle dams with two surface powerhouses. Project value approximately €3,250 million is presently under construction.Appointed to draft Conditions of Subcontract for the design, fabrication, erection and commissioning of the E&M and HSS Packages.
- Gibe III Hydroelectric Project, Ethiopia – Appointed to draft Conditions of Contract for the EPC-Turnkey construction of a 1,870 MW hydroelectric scheme consisting of a roller compacted concrete dam with a surface powerhouse. Project value approximately €1,470 million presently under construction. Appointed to draft Conditions of Subcontract for the Design, fabrication, erection and commissioning of the E&M and HSS Packages.
- Beles Multipurpose Project, Ethiopia – Appointed to draft Conditions of Contract for the EPC-Turnkey construction of a 420 MW hydroelectric scheme consisting of a concrete intake structure, an 11 km headrace tunnel, an underground powerhouse, and a 10 km tailrace tunnel. Project value approximately €430 million presently under construction.
- Gilgel Gibe II Hydroelectric Project, Ethiopia – Appointed to draft Conditions of Contract for the EPC-Turnkey construction of a 432 MW trans-basin hydroelectric scheme consisting of a concrete diversion dam, a 26 km headrace tunnel, surface penstocks and a surface powerhouse. 26 km tunnel driven by TBM erecting precast permanent lining. Project value approximately €370 million completed in 2012.
- Gilgel Gibe I Hydroelectric Project, Ethiopia – Engaged to monitor construction and dispute resolution procedures for the construction of an asphalt faced rockfill dam and a 9 km headrace tunnel. The work was carried out under the FIDIC 4th Edition Conditions of Contract using the 1996 Supplement for dispute resolution. Project value approximately US$200 million and completed in 2003.
- Lam Ta Khong Pumped Storage Project, Thailand – Responsible for preparation of commercial proposal, project monitoring, cost control and dispute resolution procedures for the construction of a 1,250 MW Pumped Storage scheme consisting of two inclined penstock shafts, an underground powerhouse and tailrace. Contract conditions were FIDIC 4th Edition where disputes were resolved during an arbitration under UNCITRAL Rules. Project value approximately US$120 million and completed in 1998.
- Bhumibol Pumped Storage Hydroelectric Expansion, Thailand – Responsible for preparation of commercial proposal and dispute resolution procedures for the construction of a 165 MW Pumped Storage expansion of existing power station. Disputes were resolved amicably during construction. Project value approximately US$40 million and completed in 1995.
- Pak Mun Hydroelectric Project, Thailand – Responsible for preparation of commercial proposal and dispute resolution procedures for the construction of a 240 MW run-of-river scheme consisting of a concrete powerhouse and gated regulating structure. Disputes were resolved amicably during construction. Project value ap-proximately US$100 million and completed in 1994.
- Xeset Hydroelectric Project, Laos – Responsible for monitoring dispute resolution procedures for the construction of a run-of-river hydroelectric project with an installed capacity of 45 MW. The work was carried out under the FIDIC 4th Edition Conditions of Contract. Disputes were resolved amicably during construction. Project value approximately US$20 million and completed in 1990.
- Maseru Leribe Road Rehabilitation, Lesotho – General manager for the construction of 100 km of road rehabilitation work between Leribe and Maseru. Construction carried out under the South African Standard Conditions. Project Value approximately US$20 million and completed in 1987.
- Gaborone Dam Raising Contract, Botswana – General manager for the raising of the existing dam and railway bypass for the water supply of the city of Gaborone. Construction carried out under the FIDIC Conditions of Contract 3rd Edition. Project Value approximately US$25 million and completed in 1986.
- Lesotho Rural Airports Project – General manager for the construction of 9 rural airport in the mountainous areas. Construction carried out under the FIDIC Conditions of Contract 3rd Edition. Project Value approximately US$25 million and completed in 1986.
- Matsapha International Airport Contract, Swaziland – General manager for the construction of the Matsapha International Airport. Constructed under the South African Standard Conditions. Disputes resolved in ICC Arbitration. Project value ap-proximately US$40 million and completed in 1984.
- Springs Railway Marshalling Yard, South Africa – General manager for the construction of the Springs Marshalling Yard. Constructed under the South African Railways Standard Conditions. Project value approximately US$20 million and completed in 1984.
- Newcastle – Volkrust Railway Link, South Africa – General manager for the construction of the Newcastle – Volkrust Rail Link. Constructed under the South African Railways Standard Conditions. Work included hard rock tunnelling as well as elevated structures. Project Value approximately US$25 million and completed in 1984.
- New Approach Channel to Mina Zayed Port, Abu Dhabi – Project manager for the dredging of new approach channel for the existing port. Project Value approximately US$15 million and completed in 1982.
- Bandar Abbas Commercial Port, Iran – Project manager for the first three years of construction of the commercial port of Bandar Abbas including dredging, breakwater, quays, railway marshalling infrastructure, and reclamation works. Project Value approximately US$900 million (1975-1978).
- High Island Reservoir, Hong Kong – Appointed to prepare commercial proposal, direct technical work and manage dispute resolution for two 100m rockfill dams constructed partially in the open sea. Project value approximately US$120 million (1972-1975).
Specialties
- Contract Management, and Delay Analysis.
- Resolution of contractual disputes on Civil Engineering, Building, Highway, Marine and Dredging Contracts; Dispute Adjudication Boards and Arbitration.
- Development of Bid Estimating and Cost Control Systems for Contractors.
- Ground investigations for high rise construction and underground works involving tunnelling and large openings.
- Training in the use of FIDIC Contract Forms and the application of Dispute Boards to construction contracts; including First Edition 1999 and 2017 and earlier.
Publications
- Goodman, R. and Appuhn, R.; “Model Experiments on Earthquake Response of Soft Ground Filled Basins”; Geological Society of American Bulletin; vol. 77, no. 11; Nov. 1966.
- Appuhn, R. and Fernandez E.; “Lam Ta Khong Pumped Storage Project” a case study; Tunnels and Tunnelling”; January 1998.
- Drafting Committee Member, “Subcontract for use with FIDIC Conditions of Contract for Construction”, 2009.
- Drafting Committee Member; “EIC Contractor’s Guide to the FIDIC Conditions of Contract, Construction”; 2002.
- Drafting Committee Member; “EIC Contractor’s Guide to the FIDIC Conditions of Contract, Plant and Design-Build”; 2003.
- Appuhn, R. and Eggink, E; “The Contractor’s View on the MDB Harmonized Version of the New Red Book”; The International Construction Law Review, Vol. 23, January 2006.
- Appuhn, R. “FIDIC Conditions of Contract for Construction, MDB Harmonized Edition, 2005, A Contractor’s Perspective”; Construction Law International, Vol 1; March 2006.
- Appuhn, R; “A Case History: DAB Use of Experts and Time Limits Under the FIDIC Rules”; Dispute Board Foundation FORUM, Volume 16, Issue 3, August 2012.
- Appuhn, R and Grove, J; “Comparative Use of Dispute Boards in the United States and Abroad”, American Bar Association Constructor, September 2012.
International Experience
Have lived and/or worked in the Far East, Middle East, Africa, Europe and Latin America as follows:
| Europe | Romania, Serbia, Bosnia, Montenegro, Latvia and Albania. |
| Far East | Thailand, Hong Kong, Laos, Philippines, Indonesia and Vietnam. |
| South Asia | Pakistan, India. |
| Middle East | Iran, Saudi Arabia, Jordan, Armenia and United Arab Emirates. |
| Africa | South Africa, Botswana, Swaziland, Lesotho, Malawi, Tanzania, Uganda, Cameroon, Guinea, Liberia, Morocco, Tunisia, Egypt, Zambia, and Ethiopia. |
| Latin America | Mexico, Panama, and Argentina. |
Career Summary
| 2001- Present | Consultant, arbitrator, dispute adjudicator and expert. Providing consulting and expert services to Employers, Engineers and Contractors for civil engineering, tunnelling and dredging contractors for work acquisition, project contract management and dispute resolution. Engaged by the Turkey Delegation to the European Commission to draft standard particular conditions of contract for use with the FIDIC Construction and Design-Build editions and Terms of Reference for consultants. FIDIC Contract Committees. Drafter of Standard Conditions of Subcontract for use with Construction and Design-Build Contracts. |
| 1997-2001 | Contracts Manager for overseas activities, Salini Costruttori SpA. |
| 1988-1997 | Commercial Manager; Far East Representative: – Commercial proposals; budget and financial control; dispute resolution, Vianini Lavori SpA. |
| 1981-1986 | General Manager and Director of Southern Africa activities, Stirling International Civil Eng. Ltd. |
| 1978-1981 | Project Manager for major dredging projects in Iran and the United Arab Emirates, Dragomar SpA. |
| 1975-1978 | Project Manager and Contractor’s Representative Shah Bandar Abbas Project in Iran, Società Italiana per Condotte d’Acqua. SpA. |
| 1971-1975 | Estimator and Project Engineer, High Island Reservoir Scheme, Hong Kong, Vianini SpA. |
| 1970 | Expert Witness in a dispute in connection with the Blue River Dam Development, Lockheed, Shipbuilding & Construction Ltd. |
| 1968-1970 | Project Geologist for the Sirikit Dam Project Thailand, Engineering Consultants Inc. |
| 1967-1968 | Estimator, Lockheed, Shipbuilding & Construction Ltd. |
| 1963-1967 | Civil Engineer for site investigations and foundation design for Site Development and High Rise Structures, Lee & Praskzer, Consulting Civil Engineers. |
| 1962 | Civil Engineer, Porter, O’Brien & Armstrong, Sacramento CA |
| 1961 | Geologist, McCreary Koretsky Civil Engineers, San Francisco CA |

